ABOUT
Professional projects.
Before NilWire began consulting in 2020, Nilay delivered networks for carriers, banks, global enterprises and data centres. These 20 projects and 9 network operations engagements, grouped by theme, show the experience behind the stacks. Employers and years are in the career table on the Founder page.
Protocols and technologies across this career: RIP, EIGRP and Spanning Tree at Raymond; OSPF and ADSL at Pathway Communications; OSPF, BGP and Spanning Tree at HCL; and OSPF and other routing protocols, with hypervisors and hyperconverged infrastructure, at SBI Shinsei Bank.
Data centres and virtualisation
Reading the traffic before drawing the topology.
Project 1 · SBI Shinsei Bank
Two active-active data centres in Japan
Data centre architecture for Fukuoka and Esaka, built on a measured picture of real traffic and security needs.
Project 2 · SBI Shinsei Bank
Virtual desktops on a converged platform
A highly available, scalable virtual desktop platform on an engineered compute, network, storage and virtualisation stack.
Project 3 · SBI Shinsei Bank
Hyperconverged infrastructure with micro-segmentation
An evaluation that gave the bank a sound basis for its next data centre decisions.
Project 4 · BMW Dubai, via SBI Shinsei Bank
Hosting for BMW Dubai at the eHDF data centre
A hosted ERP and database environment in Dubai, run through a defined process with shift handover and one owner for its life cycle.
Project 5 · SBI Shinsei Bank
Global load balancing for Active Directory
Users steered by DNS to the best available data centre, in 2012.
MONITORING AND PERFORMANCE
A network earns trust when its behaviour can be measured.
Project 6 · SBI Shinsei Bank
Network management at the centre
An integrated, secured management system giving operations one reliable view of the data centre network.
Project 7 · SBI Shinsei Bank
Real-time monitoring of every path
Data, voice and application paths watched in real time, directing traffic management and capacity planning.
Project 8 · HDFC Bank
Proving real-time bandwidth monitoring
A proof of concept at the Chandivali data centre, from architecture analysis to final reports, led as Network Solution Architect.
Security and segmentation
Design begins with how traffic moves.
Project 9 · SBI Shinsei Bank
Application servers protected by segmentation
Segments and access controls built on measured traffic, for a stronger and auditable security posture.
Project 10 · SBI Shinsei Bank
Keeping the security management system running
Daily network work brought into line with the information security framework, with audit evidence at hand.
Project 11 · SBI Shinsei Bank
Remote access for 1,400+ users
Soft-token remote access run by one engineer across a six-server estate that included the test servers.
Project 12 · SBI Shinsei Bank
The bank's secure web gateway
Planned, sized for peak HTTPS inspection, built and run end to end, around 2014 to 2016.
TELECOM AND CARRIER NETWORKS
Carriers and large networks reward careful capacity planning.
Project 13 · SBI Shinsei Bank
One shared internet for 1,000+ call-centre agents
Connectivity redesigned around a shared internet connection, with the bandwidth that voice and data need planned in advance.
Project 14 · SBI Shinsei Bank
Link aggregation
A feasibility-backed route to better use of existing circuits and lower running cost.
Project 15 · SBI Shinsei Bank
ISP rationalisation
Spend that follows need, applied through shared connectivity for the contact centre.
Project 16 · Tata Teleservices Maharashtra, formerly Hughes Telecom
A CDMA and WLL network from scratch
LAN, WAN and switching designed and deployed, carried through the acquisition, with expansion across Vidarbha.
Project 17 · BSNL CellOne
A mobile network along the Pune, Nagpur and Raipur route
More than fifty locations linked by T1 and E1 circuits, with bonding integrated into billing and customer care.
Project 18 · Life Insurance Corporation of India
Connecting LIC offices
Reliable links between offices, built on correctly installed modems and multiplexers.
Enterprise and campus networks
A business move turned into a secure, scalable network.
Project 19 · Raymond Ltd., Thane
A secure, scalable network across the Maharashtra sites
Networking and security managed across the group, with disaster recovery built into the design.
Project 20 · Kalpataru Ltd., Mumbai
Moving a head office
A new network and a mini data centre designed from scratch for the move from Fort to Santacruz.
Network operations and customer support
Nine engagements that kept live networks running.
Network operations is the work of keeping a live network healthy: watching it, resolving faults, escalating the hard cases and recording the root cause.
Client: Microsoft, Redmond, USA · Nov 2007 to Jan 2010
Microsoft MSN network: Tier-2 escalation
As a Tier-2 specialist on Microsoft's Global Network System escalation team, Nilay took over the incidents that the first line could not resolve on the network behind MSN's consumer services. He diagnosed layer by layer, from VLANs, Spanning Tree and HSRP to OSPF and BGP routing and F5 BIG-IP load balancing, and handed each case over with a written root cause. Recurring faults became investigations that ended in a lasting fix.
OSPF · BGP · F5 BIG-IP LTM and GTM · HSRP · Spanning Tree
Client: Microsoft, Redmond, USA · Nov 2007 to Jan 2010
Microsoft MS-IT network: corporate support at global scale
On the same team, Nilay supported the corporate network that connects Microsoft's offices, data centres and remote users. He traced MPLS and VPN faults by comparing the provider edge with the customer edge, and worked on routing, switching and F5 load balancing. He also took part in problem management, assessing network risk and putting mitigations in place so faults did not return.
MPLS · VPN · OSPF · BGP · F5 BIG-IP · Layer 2 and 3 switching
Client: Pathway Communications, Ontario, Canada · Jan 2007 to Oct 2007
Pathway Communications: a carrier backbone and broadband service
As NOC team lead at Netpulse, Nilay managed the core backbone of a Canadian carrier, with BGP and OSPF at the core and fibre and T1 backhaul for clients served through Bell. With the retention team he matched each customer to ADSL, bonded DSL or fibre, according to what the line could carry, and wrote the NOC's working knowledge into procedures the whole team followed.
BGP · OSPF · ADSL and bonded DSL · ZyXEL Prestige · fibre and T1
Client: HDFC Bank Ltd. and UTI Bank Ltd. (now Axis Bank), Vidarbha · Apr 2002 to Aug 2004
HDFC Bank and UTI Bank across Vidarbha
Nilay managed networking and security for HDFC Bank and UTI Bank, where every branch link must stay up. He looked after firewalls and intrusion detection, reviewed traffic and security logs, managed vendors and the purchase of network hardware, and ran regular audits so that evidence was ready for review.
Banking WAN · firewalls · intrusion detection · log monitoring · audits
Client: Bharat Petroleum Corporation Ltd., Nagpur and Vidarbha · Dec 1998 to Mar 2002
BPCL: satellite data, voice and video
At Astral Informatics, Nilay managed the VSAT systems that carried data, voice and video by satellite to BPCL locations that ground links reached poorly. A routine of signal checks guarded against alignment and weather faults, remote diagnostics resolved issues at distant sites, and tuning for satellite delay kept voice and video steady.
VSAT · satellite links · remote-site diagnostics
Client: State Bank of India, Nagpur and Vidarbha · Dec 1998 to Mar 2002
State Bank of India: branch network and security
Nilay designed and implemented WAN, MAN and LAN connectivity for the State Bank of India accounts. Leased lines with ISDN dial backup kept branches reachable through a circuit fault, firewall rules limited each branch to the services it needed, and documented configurations made restoration quick after hardware replacement.
Routers and switches · firewall policy · leased lines and ISDN
Client: Electrolux, Nagpur · Dec 1998 to Mar 2002
Electrolux: Windows NT servers and domains
Nilay administered the Windows NT Server 4.0 servers and domains that served Electrolux users, including User Manager for Domains and DNS. Groups and shares followed team and role, maintenance fell in quiet periods with verified backups, and DNS was the first check when users reported unreachable services.
Windows NT Server 4.0 · domain administration · DNS
Client: ITC Ltd., Nagpur · Dec 1998 to Mar 2002
ITC: Novell NetWare administration
Nilay administered NetWare 3.12 and 4.1 file servers for ITC, using SYSCON on the older servers and NWAdmin on the 4.1 directory tree. He reviewed trustee rights periodically, checked volumes and logs routinely, and kept a procedure for each version, so the shared data stayed dependable.
NetWare 3.12 and 4.1 · SYSCON · NWAdmin
Client: Godrej Consumer Products Ltd., Nagpur · Dec 1998 to Mar 2002
Godrej Consumer Products: reliable internet and links
Nilay kept internet connectivity reliable for Godrej through leased lines, broadband and ISDN, working with the providers on faults and performance. Link logs and test results backed every escalation, a backup path covered a primary-link fault, and utilisation checks guided capacity upgrades.
Leased lines · broadband · ISDN · provider liaison
NILWIRE CLIENT WORK
The same habits, in NilWire engagements.
Since 2020 the work has continued through NilWire's own engagements, described in the case studies by sector, region and scale.
Book an assessment
See how this experience is used today.
The same habits run through every NilWire engagement. Book an assessment, or read the case studies.
