Case studies / Two industrial groups
GROWING BUSINESSES
Two industrial groups
Email, websites and enterprise data moved from local servers into a Tier III data centre, with a clear line between what the group owns and what the data centre operates.
- SECTOR
- A construction and real-estate group, and a manufacturing group of eight units, Pune
- ENGAGEMENT
- Hosted platform design, December 2021 to March 2022
- NILWIRE'S ROLE
- Design, with a Tier III hosting partner
THE SITUATION
Business IT on local servers.
Both groups ran business IT on local servers and wanted to host email, the website and enterprise data in a secured data centre, reached through VPN.
What we did
One shared design.
Virtual private data centre
Firewall, router for secured VPN, public addresses and network monitoring.
Hosted mailboxes with archiving, threat protection and migration support.
Storage and backup
Backup space with agent-based backup and alerts.
Website
A server with dedicated resources, web scanning and SSL.
Phase II
A central ERP or accounting server sized with the application vendor, with secured VPN access.
Right-sizing
For the manufacturing group, eight local accounting servers surveyed and consolidated into one hosted server sized to the real data.
WHERE IT STANDS
A clear split of responsibility.
In both designs NilWire owns what happens inside the data centre up to the file system, and the group owns what happens above it, in applications and data, recorded in a responsibility matrix of twenty-three activities.
THE STACKS INVOLVED
Where this work sits in the chain.
RELATED
Continue reading.
Case studies
All case studies
Two named flagships and more engagements described by sector, region and scale.
Library
All case studies →About
The method
Assess, design, build, prove, run, with the evidence behind each stage.
The Lab
The Lab →Consulting · first engagements
See how a first engagement works.
Start small, prove it, then scale. Six small engagements, each with a plain question and a written plan.